Current works

Council carries out work across Eurobodalla to build and improve local roads and infrastructure.

Batehaven, Caseys Beach+

We’re rebuilding the seawall between Beach Road and Caseys Beach.

Why: To protect Beach Road from coastal erosion, storm damage and large waves washing over the wall.

When: August 2026 to July 2027

Work includes:

  • rebuilding the seawall using layers of hard-wearing rock
  • replacing the two sets of beach stairs once the seawall work is finished

Impacts during work:

  • The two sets of stairs within the work area will be closed during construction
  • Beach access is available via the northern car park and the stairs near the southern toilets.
  • Beach users will not be able to walk through active work areas which will move gradually along the beach as construction progresses.
  • Heavy vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters should allow extra travel time.
  • The parking and cycling lanes will not be available while work is underway.

Traffic impacts: Live Traffic NSW | Incident Details

More information: Batemans Bay coastal protection work

Cadgee, Wattlegrove Road+

We're upgrading the first section of the road.

Why: To allow for better flow of water in the creek, improve road surface and reduce maintenance requirements.

When: April to November 2026

Work includes:

  • removing the old culvert at the creek crossing
  • installing new culverts and headwalls
  • rebuilding the crossing, tying in both sides of the road
  • grading the road
  • restoring the area.

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters may experience delays.
  • Commuters will be diverted along a short side track  around the work area.

More information: Phone our construction team on 4474 1391.

Catalina, Ridge Street+

We're upgrading the water mains in a section of the street.

Why: To maintain and improve the local water supply.

When: September to November 2026

Work includes:

  • installing new water pipes and service lines in the nature strips
  • connecting the new pipes and restoring the area.

Impacts during work:

  • Some sections of driveways may need to be temporarily removed to install the pipes. We’ll fully restore any affected driveways at the end of the project.
  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters should allow extra travel time.
  • If we need to interrupt water supply or property access, we’ll notify individual households.

More information: Phone our water team on 4474 1391

Kianga, Montague Avenue+

We're upgrading the water mains in a section of the street.

Why: To maintain and improve the local water supply.

When: August to November 2026

Work includes:

  • installing new water pipes and service lines in the nature strips
  • connecting the new pipes and restoring the area.

Impacts during work:

  • Some sections of driveways may need to be temporarily removed to install the pipes. We’ll fully restore any affected driveways at the end of the project.
  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters should allow extra travel time.
  • If we need to interrupt water supply or property access, we’ll notify individual households.

More information: Phone our water team on 4474 1391

Mogo, Princes Highway+

We're helping Transport for NSW to upgrade the area outside Mogo Public School.

Why: to improve pedestrian safety

When: August to December 2026

Work includes:

  • building a footpath, retaining wall and kerb and gutter
  • formalising the road shoulder for parking
  • installing a pedestrian safety fence

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters should allow extra travel time.

More information: Phone the Transport for NSW project hotline on 1800 555 638

Moruya, Bergalia Street+

We're building a roundabout at the Dwyers Creek Road intersection.

Why: To improve safety for our growing community. This upgrade will help make the area safer for motorists, cyclists and pedestrians by slowing traffic and reducing the risk of crashes.

When: August to December 2026

Work includes:

  • adjusting the road layout to accommodate the new roundabout
  • constructing the concrete roundabout and traffic islands
  • resurfacing the road
  • installing new signs and line marking
  • restoring the surrounding area once the work is complete.

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters may experience delays.

More information: Phone our construction team on 4474 1391

Moruya, Preddys Wharf+

We're rebuiling the boat ramp.

Why: To improve safety, navigation and water access

When: 12 October to 18 December 2026

Impacts during the work:

  • The boat ramp, wharf and fish-cleaning table will be closed
  • The fishing platform and public toilets will remain open
  • Some parking spaces will be unavailable.

More information: Preddys Wharf upgrade

Moruya, Princes Highway+

We're building a roundabout and new roads alongside the TAFE and Essential Energy station.

Why: To provide access to future housing developments in Moruya, the new Eurobodalla Emergency Services Precinct, and the Moruya TAFE campus.

When: January to December 2026

Traffic impacts: Live Traffic NSW

More information: South Moruya roundabout

Moruya, South Head Road+

We're repairing damaged sections of the road surface.

Why: To ensure the road base is in good condition prior to upcoming road resurfacing work.

When: October to November 2026

Work includes:

  • removing sections of the road surface
  • applying a new road base.

Impacts during work:

More information: Phone our maintenance team on 4474 1391

Moruya, Thomas Street+

We're building the entrance to a new road in the Council reserve between 33 and 35 Thomas Street, Moruya.

Why: To support new housing in the area.

When: October to November 2026

Work includes:

  • installing stormwater drainage pits and pipes
  • constructing kerb and gutter
  • building and sealing the road

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters may experience minor delays.

More information: Phone our construction team on 4474 1391.

Narooma Cemetery+

We’re building a car park at the end of the sealed road.

Why: To improve safety and usability to better serve our community's needs.

When: November 2026

Work includes:

  • building a sealed car park
  • providing accessible parking spaces and pram ramps
  • installing kerb and gutter
  • restoring the site once work is complete.

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • The cemetery will remain open however parking will be limited.
  • Work will not take place during services or burials.

More information:

Rosedale, Rosedale Parade+

We're upgrading the water mains in a section of the street.

Why: To maintain and improve the local water supply.

When: September to November 2026

Work includes:

  • installing new water pipes and service lines in the nature strips
  • connecting the new pipes and restoring the area.

Impacts during work:

  • Some sections of driveways may need to be temporarily removed to install the pipes.
  • Large vehicles and equipment will operate in the area.
  • Traffic control measures will be in place, and commuters should allow extra travel time.
  • If we need to interrupt water supply or property access, we’ll notify individual households.

More information: Phone our water team on 4474 1391

Shire-wide, sealed roads+

We're maintaining sealed roads across the Eurobodalla by repairing potholes and carrying out heavy patching where needed.

Why: To improve safety and drivability by filling potholes as a quick repair, reducing the risk of vehicle damage and helping stop the road surface from getting worse. Where a longer-term fix is needed, we may carry out heavy patching to repair larger or more damaged sections of sealed road.

When: Work is ongoing

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • The road surface may be uneven or disturbed while pothole repairs and patching are underway, so drivers should slow down and take extra care.
  • Traffic control measures will be in place, and commuters may experience delays.

More information: Phone our maintenance team on 4474 1391.

Shire-wide, unsealed roads+

We're maintenance grading Eurobodalla Road, Kianga Forest Road and Wagonga Scenic Drive.

Why: To improve safety and drivability by smoothing the surface, removing corrugations and potholes, and helping water drain away from the road.

When: November 2026, subject to weather and road conditions

Impacts during work:

  • Large vehicles and equipment will operate in the area.
  • The road surface will be disturbed and may be uneven while grading is underway, so drivers should slow down and take extra care.
  • Traffic control measures will be in place, and commuters may experience delays or temporary restricted access.

More information: Grading schedule 2026-27

More information

For more information about current works, please contact the Moruya Depot:

  • T: 02 4474 1391